Skip Navigation Linksרכבת ישראל > Israel Railways > Modification and Extension of the Railway Route from/to the South

Modification and Extension of the Railway Route from/to the South


​Modification and Extension of the Railway Route from/to the South

Dear passengers,

commencing on Sunday, 15.1.17, the railway route from/to the South will be extended and modified on Sundays only, as follows:

  • the railway departing from Hod HaSharon Station at 07:23 am and completes its journey at Be'er Sheva Central Station, will go through the following stations: Lod (08:20 am), Ramla (08:24 am), Kiryat Gat (08:46 am), Lehavim – Rahat (09:03 am), Be'er Sheva North (09:13 am) and Be'er Sheva Central (09:20 am)

  • the route of the railway departing from Rishon LeTsion Moshe Dayan at 07:01 am was extended, and it shall begin its journey at Ashkelon Station (06:29 am) and shall go through the Stations of Ashdod (06:38 am), Yavne West (06:51 am)

  • the route of the railway departing from Ashdod at 07:08 am was extended and it shall begin its journey at Ashkelon Station (06:59 am)